Design & Integration of Hydrogen Compressor Package

Project Information

Client

EPC company

Software

Dassault Systèmes Solidworks 2018, Autodesk AutoCAD 2019

Category

Water & Waste Water Treatment

Project Duration

5 Weeks

Location

UK

Description

Client

A UK-based EPC company operational across different industry verticals that were assisting spool and structure fabrication for oil & gas, water & wastewater, and manufacturing sectors.

Engineering Requirement

Talent Brothers Engineering  team developed the 3D model for all the types of equipment and piping assembly along with the pipe support and complete fabrication package for all the aboveground piping for two sites.

Delivered

Want to know more about this project?